Construction: Chauhali Gallery

Wave damage under repair at Chauhali; 10-May-2016.

Chauhali low water key and construction of permanent wave protection, in February 2017.

Chauhali Slope Failure; 23-Feb-2017.

Chauhali Slope Failure; 23-Feb-2017.

Completed revetment between bridge and contractors camp; 01-May-2017.

Ongoing repair works in areas with slope failure; 10-Jun-2017.

Chauhali upstream temporary wave protection of 2km length without damages; 01-Oct-2017.

Temporarily protection at bridge after slope failure at Chauhali; 01-Oct-2017.

Chauhali riverbank protection, central reach after flood season; 24-Nov-2017.

Surficial slope failure at Chauhali, with concrete blocks to be salvaged; 24-Nov-2017.

Erosion upstream of Chauhali; 01-Dec-2017.