Construction: General Gallery

Barge with geobags filled and ready for dumping; 05-Dec-2015.

Curing CC Blocks used for permanent wave protection; 05-Dec-2015.

Filling geobags with sand; 05-Dec-2015.

Geobag sewing machine; 05-Dec-2015.

Geobag tag with brand, Grade, batch and lot nos; 05-Dec-2015.

Pumping sand for raising and leveling land used for CC Block casting; 05-Dec-2015.

Transporting aggregate from small boat to stockpile on land; 05-Dec-2015.

Weighing filled geobag; 05-Dec-2015.

Winches used to accurately position barge; 05-Dec-2015.

Placement of first temporary wave protection; 05-Mar-2016.

Positioning of barges at Chauhali; 05-Mar-2016.

Head of the Task Force for Quality Control, SE Design Circle-I, Mr. Tofail Ahmed checking geobag weight; 12-Mar-2016.

Sand testing at Zaffarganj; 10-May-2016.

Diving investigations; 01-Apr-2017.

Bandalling erosion protection works along Koijuri revetment; 01-Dec-2017.