Construction: Harirampur Gallery
Return to Photos/Video
Commencement of dumping of geobags in Harirampur from both sides of the barge; 12-Mar-2016.
Filling of geobags for next dumping sequence; 14-Mar-2016.
Preparation of slope for wave protection; 14-Mar-2016.
Wave protection work ongoing; 14-Mar-2016.
Small erosion of temporary wave protection at Harirampur; 26-May-2016.
Localized damage of temporary wave protection at Harirampur; 12-Dec-2017.