Barge with geobags filled and ready for dumping; 05-Dec-2015.
Curing CC Blocks used for permanent wave protection; 05-Dec-2015.
Filling geobags with sand; 05-Dec-2015.
Geobag sewing machine; 05-Dec-2015.
Geobag tag with brand, Grade, batch and lot nos; 05-Dec-2015.
Pumping sand for raising and leveling land used for CC Block casting; 05-Dec-2015.
Transporting aggregate from small boat to stockpile on land; 05-Dec-2015.
Weighing filled geobag; 05-Dec-2015.
Winches used to accurately position barge; 05-Dec-2015.
Placement of first temporary wave protection; 05-Mar-2016.
Positioning of barges at Chauhali; 05-Mar-2016.
Head of the Task Force for Quality Control, SE Design Circle-I, Mr. Tofail Ahmed checking geobag weight; 12-Mar-2016.
Sand testing at Zaffarganj; 10-May-2016.
Diving investigations; 01-Apr-2017.
Bandalling erosion protection works along Koijuri revetment; 01-Dec-2017.